US 50 & CO 71 Intersection Improvement Project Update: April 3 to April 7

Description: Monday through Friday intermittent east and westbound left lane closure on US 50 .24/7 10 foot wide 100 foot long restriction and lane shift on CO 71/CR 18...


Published: 03/31/2023
Byline: SECO News

US 50 & CO 71 Intersection Improvement Project

Traffic Update: April 3 to April 7

Ongoing Traffic Impacts

The intersection improvement project will take place on US Highway 50 at CO Highway 71/County Road 18 in Rocky Ford.

Motorists can expect:

US 50 (MP 366.74 to MP 367.12) and CO 71/CR 18 (MP 16.16 to MP 16.31)

• Monday through Friday intermittent east and westbound left lane closure on US 50 .24/7 10 foot wide 100 foot long restriction and lane shift on CO 71/CR 18

Work will consist of grading, placement of Class 6 material and conduit installation.

The project will be in operation Monday through Friday from 8 a.m. to 4 p.m.

https://www.codot.gov/projects/us50-co71-rockyford-improvements.

For information about other CDOT projects the public may log on to CDOT'S traveler information website at www.codot.gov, www.cotrip.org, or call 511 from anywhere in the state. Thank you for going Slow for the Cone Zone!

Follow SECO News on Facebook. 

Subscribe to the SECO News YouTube Channel. 



Follow SECO News on Facebook.
Subscribe to the SECO News YouTube Channel.